Clear Cincom telecom Projects - 2007

Design Double Coverage Layer for HSL-Z

Client: Siemens Netherlands   

Design of redundant layer for the GSM-R network for the high speed railway connecting Amsterdam and Brussels, under the latest ERTMS (ETCS) O-2475 guidelines; tested and optimized at speeds of 40, 120, 160, 220, 300 and 330km/h.

 

GSM-R Betuwe Route

Client: Siemens Netherlands   

Design, optimisation and validation of Dutch railway connection under the ERTMS (ETCS) O-2475 requirements.

 

IDLE-Mode measurements

Client: KPN   

Measurements of network performance, while simulating the failure of base stations; giving insight in behavior of mobile stations in relation to VGCS group calls.

 

Improving Network Performance

Client: Siemens Netherlands   

Optimizing underperforming locations in order for infrastructure supplier MobiRail to fulfill its service level agreement.

 

JJDPL line

Client: Siemens China   

Consulting with local radio planners of Siemens in China, on the roll out and optimisation of the JJDPL high speed railway from Beijing to Tianjin, constructed for the 2008 Olympics.

 

Maasvlakte/EuroMax

Client: Siemens Netherlands   

Design, optimisation and validation of the GSM-R network on the extension of the Rotterdam harbor, including the EuroMax terminal.

 

Measuring Network Performance

Client: Siemens Netherlands   

Measuring the network performance of all Dutch GSM-R enabled railways under EIRENE specifications, in order to ensure the Service Level Agreement (SLA) between GSM-R infrastructure supplier MobiRail and GSM-R railway operator ProRail.

 

2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2006 2005
X

Contact us now

You can contact Clear CinCom now by one of the following ways: call us on the phone, call us one Skype, or fill in the form so we can get back to you.

+31 24 8080106

clearcincom

...or have us call you

X

Text