Clear Cincom telecom Projects - 2007
Design Double Coverage Layer for HSL-Z
Client: Siemens Netherlands
Design of redundant layer for the GSM-R network for the high speed railway connecting Amsterdam and Brussels, under the latest ERTMS (ETCS) O-2475 guidelines; tested and optimized at speeds of 40, 120, 160, 220, 300 and 330km/h.
GSM-R Betuwe Route
Client: Siemens Netherlands
Design, optimisation and validation of Dutch railway connection under the ERTMS (ETCS) O-2475 requirements.
IDLE-Mode measurements
Client: KPN
Measurements of network performance, while simulating the failure of base stations; giving insight in behavior of mobile stations in relation to VGCS group calls.
Improving Network Performance
Client: Siemens Netherlands
Optimizing underperforming locations in order for infrastructure supplier MobiRail to fulfill its service level agreement.
JJDPL line
Client: Siemens China
Consulting with local radio planners of Siemens in China, on the roll out and optimisation of the JJDPL high speed railway from Beijing to Tianjin, constructed for the 2008 Olympics.
Maasvlakte/EuroMax
Client: Siemens Netherlands
Design, optimisation and validation of the GSM-R network on the extension of the Rotterdam harbor, including the EuroMax terminal.
Measuring Network Performance
Client: Siemens Netherlands
Measuring the network performance of all Dutch GSM-R enabled railways under EIRENE specifications, in order to ensure the Service Level Agreement (SLA) between GSM-R infrastructure supplier MobiRail and GSM-R railway operator ProRail.