The telecom consultants with unique expertise in GSM-R and indoor coverage network design

Clear cincom photo page

From network validation for the HSL-Zuid high-speed train (Amsterdam - Paris) to a base station audit in Madrid.

Please click on a photo for a wider view.

Installation of GSM-R site on the High Speed Line Tetra (C2000) downlink measurements on the Hanzelijn with the test train and receive antenna on wagon.

Installation of GSM-R site on the High Speed Line Tetra (C2000) downlink measurement setup in the test train mpJules on the Hanzelijn.

Installation of GSM-R site on the High Speed Line Tetra (C2000) uplink measurement setup measuring the Tunnel Drontermeer.

Installation of GSM-R site on the High Speed Line Tetra (C2000) uplink measurement setup Hanzelijn.

Installation of GSM-R site on the High Speed Line GSM-R Continuous Wave measurements in the Dutch city of Oldenzaal

Installation of GSM-R site on the High Speed Line Tetra Donor Cell measurement with Yagi antenna in the Dutch city of Arnhem

Installation of GSM-R site on the High Speed Line Tetra Donor Cell measurement with Cross-Polarized antenna with Hybrid Ring Junction in the Dutch city of Arnhem

Installation of GSM-R site on the High Speed Line Overview on Continuous Wave equipment setup at Amsterdam Central Station

Installation of GSM-R site on the High Speed Line Continuous Wave test antenna mounted on Amsterdam Central Station structure above the railway tracks

Installation of GSM-R site on the High Speed LineView from test antenna onto Amsterdam Central Station platforms and tracks

Installation of GSM-R site on the High Speed LineOverview Continuous Wave Antenna setup next to the Hanzelijn Drontermeer tunnel

Installation of GSM-R site on the High Speed LineContinuous Wave Antenna next to Hanzelijn Drontermeer tunnel service building

Installation of GSM-R site on the High Speed LinePossible antenna location Drontermeer tunnel Hanzelijn during Continuous Wave measurements

Installation of GSM-R site on the High Speed LineInstallation of GSM-R site on the High Speed Line in The Netherlands

BTS integration on the High Speed LineBTS integration on the High Speed Line in The Netherlands

High speed test train capable of speeds up to 350km/hHigh speed test train capable of speeds up to 350km/h

Quality of Service test on board high speed train

Speed information panel boardSpeed information panel on board high speed train

Alternative Coverage Method softwareClear CinCom engineers calibrating Alternative Coverage Method software

The prototype measurement equipmentThe prototype measurement equipment for the Alternative Coverage Method

oppler radar,distance sensorDoppler radar used as distance sensor for the Alternative Coverage Method

MP Jules test train used in GSM-R measurements MP Jules test train used in GSM-R measurements for The Netherlands

 antenna used in Tunisian GSM-RContinuous Wave antenna used in Tunisian GSM-R project

Wave measurement setup for the GSM-RContinuous Wave measurement setup for the GSM-R NCBG project in The Netherlands

Wave measurement toolContinuous Wave measurement setup mounted on existing D-AMPS mast

Static measurements recorded for the GSM-RStatic measurements recorded for the GSM-R Infoplus digital information panel project

implementation of a Leaky Feeder systemClear CinCom in tunnel radio survey for the implementation of a Leaky Feeder system

GSM site on the island of St. Eustatia tested by Clear CinCom

Clear CinCom radio surveyClear CinCom radio survey on point to multipoint network